The energy expert review the project, the design is revised to achieve Energieberatung 0.40 certification.
Decommissioning works compensated for the old structure.
The expert team sorted and removed the internal furniture and items occupying the internal space of the building.
The Special Aspetos removal team contracted and revised the hazardous materials.
The geological survey team conducted drilling surveys and completed the geological studies.
The demolition contractor starts removing the old building structure
The demolition of the old building structure is complete.
The removal of the last debris group is complete, and the soil is leveled.